refinaryrig

دیکشنری تخصصی مهندسی نفت - نسخه آنلاین


بزرگترین دیکشنری مهندسی نفت با بیش از 20 هزار کلمه ، مصور و با قابلیت تلفظ



نمایش نتیجه 18371 تا 18380 از 19882 نتیجه یافت شده برای E:
n: A kind of ways that injecting drill fluid into the annular or wellbore,which be used to control overflow and blowout.


a dynamic kill procedure, used in low pressure wells, good for a short period of time. A typical top kill is to pump 5 bbl of fluid in the tubing, offsetting the tubing pressure as the fluid falls. The well must be monitored for pressure or flow and the p

n: a lease acquired while a min to the same property is still in effect. The top lease (held by a different company) replaces the existing lease when it expires or is terminated.

a separate lease to a shallower part of the strata.

رویه ی لایه

سرستون سیمان

v: to fill a wellbore with fluid up to the surface.

توپک فوقانی

n: a cement wiper plug that follows cement slurry down the casing. It goes before the drilling mud used to displace the cement from the casing and separates the mud from the sluny. See cementing, wiper plug.

in cementing, the last plug pumped in cementing with the two plug system. It isolates the displacement fluid and cement slurry. It helps keep the heavy cement slurry from reversing or U-tubing back into the wellbore while the cement slurry is still unset.

n: in tank sampling, a spot sample obtained 6 inches (150 millimetres) below the top surface of the oil.

n: A private collar that be used in third cementing of casing.

n: a component of a packer to which the tubing is connected.



© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.