refinaryrig

دیکشنری تخصصی مهندسی نفت - نسخه آنلاین


بزرگترین دیکشنری مهندسی نفت با بیش از 20 هزار کلمه ، مصور و با قابلیت تلفظ



نمایش نتیجه 18731 تا 18740 از 19882 نتیجه یافت شده برای E:
n: Two same diesels work simultaneously to propel hoist of rig.

چاه دو قلو

adding an extra flow line with the same path to increase capacity.

using a single slot on a platform to house two wellbores, with independent controls, that are drilled to different parts of the reservoir.

n: a complete break in pipe caused by metal fatigue. v: to break something in two or to break apart, such as the head of a bolt or the drill stem.

v: Of drill pipe or drill collars,to part or split primarily because of metal fatigue.

to separate the drill string during rotation, usually from excess torque.

n: The twisting vibration caused by flux of the rotary resistance force applied on the bit.

n: Its achieved by fixing a fractional collar at the designed position of casing,which usually be used in deep well cementing .

سیمان کاری دو مرحله یی

چاه دو لوله یی



© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.