نمایش نتیجه 19481 تا 19490 از 19882 نتیجه یافت شده برای E:
n: The ratio of production of hydrodynamical completely penetrating well to hydrodynamical imperfect well.
n: 1. the activities and methods of preparing a well for the production of oil and gas or for other purposes, such as injection;the method by which one or more flow paths for hydrocarbons are established between the reservoir and the surface. 2. the system of tubulars, packers, and other tools installed beneath the well- head in the production casing;that is, the tool assembly that provides the hydrocarbon flow path or paths.
n: The last working process before the well start to produce,which include open hole completion, sand control completion and tubingless completion,etc.
that processes involved, after drilling, is properly isolate pressures and fluids, and then stimulate or restrain the formations so that hydrocarbons can be produced with minimum amounts of extraneous fluids.
n: The wiper trip and reaming to wellbore by tripping in drill string.
the drilling and completion steps prior to production.
n: the methods used to control a kick and prevent a well from blowing out. Such techniques include, but are not limited to, keeping the borehole completely filled with drilling mud of the proper weight or density during all operations, exercising reasonable care when tripping pipe out of the hole to prevent swabbing, and keeping careful track of the amount of mud put into the hole to replace the volume of pipe removed from the hole during a trip.
using barriers to prevent unwanted flow of hydrocarbons to surface.
تجهیزات فرمان چاه
n: A kind of special equipment of simulating electronic teaching, which be used in well control teaching.
مغزه
آزمایش مغزه
n: the ratio between the number of wells drilled in a field and the acre- age. Under a 40-acre spacing pattern, the well density is one well per 40 acres.
پراکندگی چاه ها
© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.