refinaryrig

دیکشنری تخصصی مهندسی نفت - نسخه آنلاین


بزرگترین دیکشنری مهندسی نفت با بیش از 20 هزار کلمه ، مصور و با قابلیت تلفظ



نمایش نتیجه 961 تا 970 از 19882 نتیجه یافت شده برای E:
روش آفماگ

n: a boring tool that consists of a shaft with spiral channels. An auger may be used to bore the hole for a pipeline that must cross beneath a roadbed.
مته ی مارپیچ

مته ی مارپیچ

مته ی دستی مارپیچ

قسمتی از لوله حفاری که دارای پیچ مته ای است

ساقه مته ی مارپیچ

a steel with a microstructure consisting of austentite at room temperature.

a clay or other mineral that was formed within the pore spaces of the rock. The material is most often formed by reaction or precipitation from connate fluids.

formations that formed in the present locations and have not been transported.

n: an estimate of costs prepared by a lease operator and sent to each non operator with a working interest for approval before work is under taken. Normally used in connection with well-drilling operations.

n: A document signed by management that authorizes funds to be spent against an approved budget.



© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.