refinaryrig

دیکشنری تخصصی مهندسی نفت - نسخه آنلاین


بزرگترین دیکشنری مهندسی نفت با بیش از 20 هزار کلمه ، مصور و با قابلیت تلفظ



نمایش نتیجه 17131 تا 17140 از 18673 نتیجه یافت شده برای O:
a limit flow velocity for a specific fluid, either minimum or maximum, that would accomplish a task. Threshold Velocities are usually minimums to promote liquid lift in a gas well, or a minimum velocity to keep a pipe surface clean.

n: a stand of pipe made up of three joints and handled as a unit. Compare double, fourble, single.

n: Its made up of three drill pipe.
شاخه ی سه بند

a triple, or three joints of pipe screwed together.

n: the name used for the derrickhands working platform, the monkeyboard, when it is located at a height in the derrick equal to three lengths of pipe joined together. Compare double board, fourble board.

n: Also called kelly board,which is the operation board where derrick monkey work.



کاهش دادن

n: The assembly of valve, throttle valve, apparatus and pipeline,which be used to control the velocity come from bore hole after shutting down preventer.





شیر تنظیم جریان

n: the choking or failing that occurs when a mud pump fails to deliver a full amount of fluid through one or more of its valves. Throttling is usually caused by improper valve lift.

controlling flow with a reduced orifice.

n: a valve, usually only partiallyopen or closed, used to regulate the rate of flow.

TFL, a completion or repair technique that depends on pumping the tools or equipment into a flow line and down the well.



© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.