refinaryrig

دیکشنری تخصصی مهندسی نفت - نسخه آنلاین


بزرگترین دیکشنری مهندسی نفت با بیش از 20 هزار کلمه ، مصور و با قابلیت تلفظ



نمایش نتیجه 17171 تا 17180 از 18673 نتیجه یافت شده برای O:
n: a device to which a guy wire or brace may be attached, such as the anchoring device for the deadline of a hoisting-block arrangement.

n: The equipment that be used to fasten anchor rope and lace.

n: The sheaves that be fastened at the deadlock end of wire rope.

n: a collective term for the construction tasks bypassed by regular crews on pipeline construction. Tie-in includes welding road and river crossings, valves, portions of the pipeline left disconnected for hydrostatic testing, and other fabrication assemblies, as well as taping and coating the welds.

n: workers responsible for tie- in tasks in the construction of a pipeline.

n: a federal form used by companies or individuals for submitting annual inventory data on hazardous chemicals or extremely hazardous substances. See SARA Title III.

a tank for holding treating or flowed back fluids.

n: Casing string be trip in the wellbore that its diameter smaller than the diameter of bit,then the casing string cannt trip in or pick up readily.

n: an emulsion that is relatively difficult to break. Compare loose emulsion.

n: a petroleum- or waterbearing formation of relatively low porosity and permeability.

n: The oil-bearing formation or water-bearing formation of low porosity and permeability.


non specific term meaning lower permeability.

natural gas held in reservoirs of low permeability that cannot be accessed in an economically reasonable time by natural flow methods. Hydraulic fracturing is required to create formation exposure sufficient to produce the gas.



© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.