refinaryrig

دیکشنری تخصصی مهندسی نفت - نسخه آنلاین


بزرگترین دیکشنری مهندسی نفت با بیش از 20 هزار کلمه ، مصور و با قابلیت تلفظ



نمایش نتیجه 17291 تا 17300 از 18673 نتیجه یافت شده برای O:
رویه ی لایه

سرستون سیمان

v: to fill a wellbore with fluid up to the surface.

v: to finish filling a tank.

توپک فوقانی

n: a cement wiper plug that follows cement slurry down the casing. It goes before the drilling mud used to displace the cement from the casing and separates the mud from the sluny. See cementing, wiper plug.

in cementing, the last plug pumped in cementing with the two plug system. It isolates the displacement fluid and cement slurry. It helps keep the heavy cement slurry from reversing or U-tubing back into the wellbore while the cement slurry is still unset.

n: in tank sampling, a spot sample obtained 6 inches (150 millimetres) below the top surface of the oil.

n: A private collar that be used in third cementing of casing.

n: a component of a packer to which the tubing is connected.

آب فوقانی



© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.