refinaryrig

دیکشنری تخصصی مهندسی نفت - نسخه آنلاین


بزرگترین دیکشنری مهندسی نفت با بیش از 20 هزار کلمه ، مصور و با قابلیت تلفظ



نمایش نتیجه 17571 تا 17580 از 18673 نتیجه یافت شده برای O:
بندآور لوله ی استخراج

اتصال رشته لوله ی استخراج

اتصال رشته لوله ی استخراج

n: It contain shell,tubular shaft,lower sub,0-ring and bearing,which be used to test and workover.

end of tubing.

n: a valve operated by tubing rotation that is used to shut off formation pressure above a packer, thus testing all connections from the packer to the tree. tubing test string n: a string of tubing run in a well for a production test in which a well test surface package is used. A tubing test string is similar to a normal tubing string except that it may contain special valves and other tools needed for the well test.

آچار لوله ی استخراج

n pI: large wrenches used to break out and make up tubing. They may be operated manually, hydraulically, or pneumatically.

a gas lift valve controlled by pressure in the tubing.

n: see work string.



© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.