the time spent waiting on cement to reach sufficient strength to proceed with operations.

n: The time that waiting the cement slurry to solidify after injecting the slurry into the well.

دکل منتظر تعمیر

adj: (WOW) pertaining to the time when drilling or other operations are suspended because of bad weather.

منتظر وضعیت آب و هوایی

n: The amizuthal change caused by the element of formation and bit in table drilling.

پارسنگ شاهین حفاری

n: the horizontal steel member of a beam pumping unit that has rocking or reciprocating motion.

n: A steel structural beam of cable drilling or beam pumping unit,which can wave up and down.

شاهین حفاری


the main moving beam in a beam lift pump.

a cement squeeze under the fracture pressure, trying to build pressure slowly. Typical in fracture sealing.