نمایش نتیجه 11361 تا 11370 از 14709 نتیجه یافت شده برای P:
n: the derrick or mast, draw works, and attendant surface equipment of a drilling or workover unit.
n: the derrick, draw-works, rotary table and all associated equipment required to drill a well.
typically a well drilling or service unit capable of pulling and running joined tubing.
n: the capicity to hold the hook-load and retard the continuous movement of hook load within reasonable specified limits compatible with specific requirements.
n: The worker that responsible of the installnation of all parts of drilling rig.
n: The cost of drilling per hour in the drilling process.
n: see rotary helper.
v: to dismantle a drilling rig and auxiliary equipment following the completion of drilling operations. Also called tear down.
n: To take apart equipment for storage and portability. Equipment typically must be disconnected from power sources, decoupled from pressurized systems, disassembled and moved off the rig floor or even off location.
disassemble the equipment that was placed around a well for a specific work operation.
برچیدن
n: The time of stopping drill caused by waiting material and order ,or repairing the equipment.
n: for example, tongs,slips,elevator and other tools.
n: The worker that coordinating the driller to drill on the drilling floor.
کارگر حفاری
n pl: the metal parts (with the exception of nails, bolts, guy wires, and sand lines) used in the construction of a standard cable-tool rig.
n: The metal components be used to make standard cable rig.
© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.