نمایش نتیجه 11381 تا 11390 از 14709 نتیجه یافت شده برای P:
n: The benefit gain from shorting the cycle of drilling.
n: The work of transport the total rig and derrick equipment to a new well, usually dont need to detact the equipment.
v: to prepare the drilling rig for making hole, i.e., to install tools and machinery before drilling is started.
v : to make ready for use. Equipment must typically be moved onto the rig floor,assembled, and connected to power sources or pressurized piping system.
assemble equipment at the wellsite for work on a well.
n: The professional crew that responsible of installing the derrick and drilling rig.
n: The time from setting to detactment after completion on the well site.
n: The test of choosing dispensation and seeing the characteristics for easy drilling on the well site.
n: The worker that responsible of the installnation of all parts of drilling rig.
زمان آماده کردن
لوله ی حفاری
n: The drill pipe with right-hand fine threaded at two end.
© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.