نمایش نتیجه 11581 تا 11590 از 14709 نتیجه یافت شده برای P:
v: To connect pipe together and lower the connected length into the borehole in a controlled fashion. The pipe lengths are usually screwed together either with rotary-shouldered connections for the drillstring, or threaded and coupled connections for casing,
v: to lower a string of casing into the hole. Also called to run casing.
v: The work of pulling the casing into the hole.
n: a landmans list and brief description of all the documents in the history of ownership of a given tract of land. Compare takeoff. See chain of title.
n: a monthly summary of run tickets given by the purchaser or operator of crude oil, detailing volume gravity, price, and value of each run ticket.
n: a record of the oil transferred from the producers storage tank to the pipeline. It is the basic legal instrument by which the lease operator is paid for oil produced and sold. Also called delivery ticket, measurement ticket, receipt ticket.
a record of the oil moved from a storage tank or through a pipeline to custody of another company.
n: a platform encircling the top of the derrick.
سکوی دور گرد
پایین دادن لوله ی حفاری
n: the driven element in a hydraulic coupling that is connected to the driven equipment.
n: The operation of forced tripping in at the case of high pressure in the hole.
n: Let the drill pump drive in parallel for increasing the delivery capacity and bit hydraulic horsepower then develop the rate.
© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.