refinaryrig

دیکشنری تخصصی مهندسی نفت - نسخه آنلاین


بزرگترین دیکشنری مهندسی نفت با بیش از 20 هزار کلمه ، مصور و با قابلیت تلفظ



نمایش نتیجه 12211 تا 12220 از 14709 نتیجه یافت شده برای P:
a geologic period of time between 40 and 425 million years ago.
سیلورین

simultaneous operations.

طوقه ی سیمان کاری یک طرفه

n: modified version of flanged fitting. Flange bolts are replaced with a single chamber that holds the plate.

two or more wells simultaneously fractured to achieve benefits of pressure diversion of fracturing within the formation.

n: a noncompetitive procedure-basically a drawing-used to grant oil and gas leases on federal lands that have not been leased before.

abbr: stain;used in drilling reports. stock build n: oil produced but not consumed and therefore in storage.

n: a graphic mathematical representation of the wave form of alternating current or voltage.

n: in an orifice meter installation, a type of singlechamber fitting that has a lever and gears that can be used to roll the orifice plate up and out of the fitting.

n: a joint of drill pipe. Compare double. fourble. thribble.

n: one joint of pipe



© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.