نمایش نتیجه 13331 تا 13340 از 14709 نتیجه یافت شده برای P:
A deposit of heavy oil, usually with API gravity less than about 18o. May have sand content of 50%.
n: the weight of an empty container subtracted from the gross weight of the container and that which is in the container to ascertain net weight.
n: a bull plug or a blind flange at the end of a tee to prevent erosion at a point where a change in flow direction occurs.
a preferred outcome from an activity.
n: The deviation excepted of predictive target stratum,usually as one of exponent of direction well.
عمق نهایی
n: a meter that balances target force with a feedback force applied above a fulcrum.
adj: said of a fluid piping system in which flow impinges on a lead-filled end (target) or a piping tee when fluid flow changes direction.
n pi: certain substances under TSCA that present an unreasonable risk of injury to health or to the environment," for example, asbestos and PCB.
n: the rate set by pipeline companies for moving oil.
© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.