نمایش نتیجه 14441 تا 14450 از 14709 نتیجه یافت شده برای P:
n: the methods used to control a kick and prevent a well from blowing out. Such techniques include, but are not limited to, keeping the borehole completely filled with drilling mud of the proper weight or density during all operations, exercising reasonable care when tripping pipe out of the hole to prevent swabbing, and keeping careful track of the amount of mud put into the hole to replace the volume of pipe removed from the hole during a trip.
using barriers to prevent unwanted flow of hydrocarbons to surface.
n: A kind of special equipment of simulating electronic teaching, which be used in well control teaching.
n: the ratio between the number of wells drilled in a field and the acre- age. Under a 40-acre spacing pattern, the well density is one well per 40 acres.
پراکندگی چاه ها
تهی شدن چاه
انحراف چاه
چاه بهره ده با تنظیم پس فشار
n: the fluid, usually a combination of gas, oil, water, and suspended sediment, that comes out of a reservoir. Also called well stream.
تبدیل شیرآلات سر چاه
n: The surface termination of a wellbore that incorporates facilities for installing casing hangers during the well construction phase. The wellhead also incorporates a means of hanging the production tubing and installing the Christmas tree and surface flow
مجموعه ی سر چاه
n: The surface termination of a wellbore that incorporates facilities for installing casing hangers during the well construction phase. The wellhead also incorporates a means of hanging the production tubing and installing the Christmas tree and surface flow
© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.