refinaryrig

دیکشنری تخصصی مهندسی نفت - نسخه آنلاین


بزرگترین دیکشنری مهندسی نفت با بیش از 20 هزار کلمه ، مصور و با قابلیت تلفظ



نمایش نتیجه 1511 تا 1520 از 14709 نتیجه یافت شده برای P:
an older perforating method where hardened steel bullets were fired from short barrels and designed to penetrate the casing, cement and formation.

مشبک کاری گلوله یی

n: a tubular device that, when lowered to a selected depth within a well, fires bullets through the casing to provide holes through which the formation fluids may enter the wellbore.

n: A kind of tubing device, tripped in to the predetermined depth, ejecting bullet and breaking through cement stone and casing to form a passage of oil and gas.
تفنگ مشبک کاری


n pI: the devices loaded into perforating guns to penetrate casing and cement and for some distance into the formation when the guns are fired. See gunperforate.

n: 1. forcing gas back into a formation by pumping into the annulus from the surface.2. any pumping procedure in which fluid is pumped into the well against pressure.

forcing fluids in the pipe into the formation at a pressure higher than the pore pressure and sometimes higher than the fracturing breakdown pressure. Used to displace a kick out of the pipe when wellbore and wellhead pressure limits permits.

v: to use a mill to remove the outside area of a permanent downhole tool.

n: an earthen pit in which waste oil and other materials are burned.

n: a milling device attached to the bottom of washpipe that mills or drills debris accumulated around the outside of the pipe being washed over. Usually, a bum shoe has pieces of very hard tungsten carbide embedded in it. Also caned a rotary shoe. See washpipe.

v: to cause the pump on a pumping unit to hit the bottom of the well by having too long a sucker rod string in the unit.

rod string stoke too long and hitting the bottom of the pump.



© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.