نمایش نتیجه 1971 تا 1980 از 14709 نتیجه یافت شده برای P:
completions engineer.
cation exchange capacity.
n: the height above the ground up to the base of the lowest layer of clouds when over half the sky is obscured.
n: the maximum lawful price that may be charged for the first sale of a specified NGPA category of natural gas. cellar n: a pit in the ground, usually lined with concrete, steel pipe, or wood, that provides additional height between the rig floor and the wellhead to accommodate the installation of blowout preventers, rathole, mousehole, and so forth. It also collects drainage water and other fluids for subsequent disposal.
n: SrSO4, A kind of natural strontium sulfate. The SP is from 3.7 to 3.9. Usually used for heavy weight additive of drill fluid.
سلول
a Spar platform with multiple floatation sections. Cellar: a concrete or culvert pipe walled section below ground that often protects and shelters the annular access valves. Also used to house the BOP’s on a drilling well.
n: The well drilled in the center of well head in order to install cellar connection, expel sewage and pretect derrick footing from being submerged.
چال دکل
n: See well head set up.
n: The valve controlling the fluid passing through well head.
© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.