refinaryrig

دیکشنری تخصصی مهندسی نفت - نسخه آنلاین


بزرگترین دیکشنری مهندسی نفت با بیش از 20 هزار کلمه ، مصور و با قابلیت تلفظ



نمایش نتیجه 2201 تا 2210 از 14709 نتیجه یافت شده برای P:
n: see back-pressure. choker hitch n: in crane operations, a method of attaching a sling to a load in which one end of the sling is passed around the load, through an attachment or an eye on the other end, and then to the cranes hook. As the load is lifted by the crane, the hitch tightens on the load.

pressure-controlling choke components, usually replaceable, expendable pieces.

n: a wire rope sling that forms CHRISTMAS a slip noose around an TREE object to re moved or lifted by a crane.

cold heavy oil production with sand.

n: the conbul valves, pressure gauges, and chokes assembled at the top of a well to control the flow of oil and gas after the well has been drilled and completed. It is used when reservoir pressure is sufficient to cause reservoir fluids to flow to the surface.

n: The set of valves, spools and fittings connected to the top of a well to direct and control the flow of formation fluids from the well.


the control sections that sits above the basic wellhead. It may contain hangers, master valves, annular valves, wing valves, and gauges or pressure, flow rate or monitoring measurement equipment.
چند راهه ی فوران


n: a compound in which chromium has a valence of 6, e.g., sodium bichromate. Chromate may be added to drilling fluids eimer directly or as a constituent of chrome lignites or chrome lignosulfonates. In certain areas, chromate is widely used as a corrosion inhibitor, often in conjunction with lime.

 کروماتوگراف

دستگاه تجزیه ی گاز به طریق کروماترموگرافی

رنگ نگاری

n: an analytical instrument mat separates mixtures of substances into identifiable components by means of chromatography.



© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.