n: The circulating method of keeping required circulating rate of drilling fluid.

n: the movement of drilling fluid out of the mud pits, down the drill stem, up the annulus, and back to the mud pits. See normal circulation, reverse circulation.

n: The movement of drilling fluid through the flow system on a drilling or workover rig. This circulation starts at the suction pit and goes through the mud pump, drill pipe, bit, annular space in the hole, flowline, fluid pits, and back again to the suction

see Puncher Charge.

n: A tool of establishing emergency circulation under desired pressure.

valve normally placed across the circulation point to allow isolation of the tubing strings or tubing/casing during production.

n: The passage of drill fluid flowing.

n: The total time that drill fluid returns to the drill fluid pool through mud pump, swivel, drill pipe, drill bit, annular and purification plant.

n: The volume flow rate of the circulating drilling fluid, usually expressed in gallons per minute or barrels per minute.

n: a variation of squeeze cementing for wells with two producing zones in which (1) the upper fluid sand is perforated;(2) tubing is run with a packer, and the packer is set between the two perforated intervals;(3) water is circulated between the two zones to remove as much mud as possible from the channel;(4) cement is pumped through the channel and circulated;(5) the packer is released and picked up above the upper perforation, a low squeeze pressure is applied, and the excess cement is circulated out. The process is applicable where there is communication behind the pipe between the two producing zones because of channelling of the primary cement or where there is essentially no cement in the annulus.

a secondary or repair cement method using upper and lower perforations and a packer set between. Circulation is established with water and mud remover chemicals to clean the channel. Cement is circulated with a set volume pumped, then the packer is releas

a sub in the circulating string with a side port that can be opened remotely to allow circulation from that point.