نمایش نتیجه 2501 تا 2510 از 14709 نتیجه یافت شده برای P:
تراکم پذیری
n: The compacting load chosen to make sample according to the depth of collapsing formation when doing preventing caving test.
n: a decrease in the volume of a stratum due to pressure exerted by overlying strata, evaporation of water, or other causes.
n: The process of breaking cuttings and compacting it into sample with compaction cell when doing preventing caving test.
a crushing of the matrix structure as overburden loads press down on the rock, reducing the pore space. During production of the well, the load on the matrix increases as the pore-filling fluids are removed. These loads may reduce the porosity of the rock
تراکم
n: see draped anticline.
n: A kind of device that is used to compact different samples.
a drive mechanism in a weak zone that displaces fluid by reducing the overall volume of the formation.
فلنج قرینه
n: see company representative.
n: see company representative.
n: An employee of an operating company whose job is to represent the operators interests on the drilling rig (sometimes referred to as drilling supervisor or company toolpusher).
the operating company representative on location.
© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.