نمایش نتیجه 2761 تا 2770 از 14709 نتیجه یافت شده برای P:
n: Usually refers to the project crashing of well control. Mainly including technical training of rig personnel and system of job responsibility of well control.
the hydrocarbons that are estimated to be potentially recoverable from known accumulations, but which are not currently considered to be commercially recoverable.
measurement of a formation being present over a large area.
n: The cementing head which can store one or two rubber plugs.
سیستم زنجیر یا کابل پیوسته
n: in an oil and gas lease, a clause designed to keep drilling operations going steadily after the primary term has expired. In some clauses, designated intervals between completion of one well and commencement of the drilling of another may require the operator to develop the leased land up to its allowable density.
شیب سنج پیوسته
n: a sampler that automatically adjusts the quantity of sample in proportion to the rate of flow.
n: a log used to determine the contribution of each zone to the total production or injection. These sureys are used to indicate chages in the flow pattern versus changes in conditions at the suface, in time, in type of operation, or after stimulation treatments;particularly useful for measuring gas well flow.
n: See oil phase drilling fluid.
© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.