refinaryrig

دیکشنری تخصصی مهندسی نفت - نسخه آنلاین


بزرگترین دیکشنری مهندسی نفت با بیش از 20 هزار کلمه ، مصور و با قابلیت تلفظ



نمایش نتیجه 2961 تا 2970 از 14709 نتیجه یافت شده برای P:
n: a method of forming compounds in which atoms share electrons, thus forming nonpolar, or covalent, unions.

n: the measurement from the top of a pipeline to the top of the soil used to cover the pipeline along a right-of-way. Ditch depth and cover requirements are regulated by the US Department of Transportation.

n: a type of packer developed both an oil and a gas zone, with the gas zone on the bottom.

n pi: requirements, usually set by a regulatory agency, concerning the characteristics and manner of covering a pipeline.

v: Cover well head to prevent objects dropping into the wellbore.

abbr: casing pressure or casing point;used in drilling reports.
حفاظت کاتدی

casing point.

abbr: computerised production control.

abbr: the correction for pressure on steel;a factor used during a proving run to adjust for pressure on the steel of the prover and pipe.

central power station.

critical pitting temperature.



© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.