refinaryrig

دیکشنری تخصصی مهندسی نفت - نسخه آنلاین


بزرگترین دیکشنری مهندسی نفت با بیش از 20 هزار کلمه ، مصور و با قابلیت تلفظ



نمایش نتیجه 3151 تا 3160 از 14709 نتیجه یافت شده برای P:
complete well on paper exercise.

completion and workover riser.

n: the number of strokes a piston makes from one intake stroke to another intake stroke. Diesel engines may have either two strokes or four strokes per cycle.

n: condense produced from cycle gas.

n: gas that is compressed and returned to the gas reservoir to minimise the decline of reservoir pressure.

gas that is separated and reinjected.

n: See circulation period.

n: The quotient of well total depth divides total time including productive time, nonproductive time, and rig releasing and installing time.

n: The time of a cycle, or down the hole and back. The time required for the pump to move the drilling fluid in the hole. The cycle time in minutes equals the barrels of mud in the hole divided by barrels per minute being pumped.
زمان گردش گل

round trip time for a circulated fluid.

the trip time for a plunger from dropping to recovery.



© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.