refinaryrig

دیکشنری تخصصی مهندسی نفت - نسخه آنلاین


بزرگترین دیکشنری مهندسی نفت با بیش از 20 هزار کلمه ، مصور و با قابلیت تلفظ



نمایش نتیجه 3191 تا 3200 از 14709 نتیجه یافت شده برای P:
a formation sizing criteria that shows impact of fines.

n: The amount of work that relevant organization, personnel, device and tool expend a day.

n: (DCQ) that daily quantity of gas, formulated on some basis (usually a combination of reserves and delivery capacity or delivery capacity only). that the pipeline company will attempt to take;mayor may not equal the take-or-pay quantity.

n: See daily advance.

n: a record made each day of the operations on a working drilling rig and, traditionally. phoned or radioed in to the office of the drilling company every morning. Also called morning report. See drillers report.

n: One of report of drilling operation. The original record of drilling operation recorded by day.

the daily report on activities, results, and shows of the past 24 hours.

n: The schedule assembled by drilling company about footage, well depth, formation of wells in 24h.

 تولید روزانه


a general term commonly referring to an obstruction in the flow path.

n: the clause in an oil and gas lease that specifies that the lessee will be liable to the surface owner for damage to growing crops and other listed items.



© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.