refinaryrig

دیکشنری تخصصی مهندسی نفت - نسخه آنلاین


بزرگترین دیکشنری مهندسی نفت با بیش از 20 هزار کلمه ، مصور و با قابلیت تلفظ



نمایش نتیجه 3231 تا 3240 از 14709 نتیجه یافت شده برای P:
(pronounced tower") n: in areas where three 8-hour tours are worked, the shift of duty on a drilling rig that starts at or about daylight. Compare evening tour;graveyard tour.

day working shift.
شب کار

n: Bringing out the photoplate from the single shot inclinometer without darkroom or black bag in the daytime.

n: A paying regulate in drilling contract. Usually taking this paying method when drilling into the hard formation or the operation which can not be paid by footage.

adj: descriptive of work done on daywork rates.

n: The work whose capacity is computed by day. It is a foundation of paying.

n: A kind of contract that operator pays authorized cost by day in order to compensate operating cost about drilling rig and operating force.

n: The operation which is not included in payment by footage in drilling contract. For example, coring, DST, ES and perforation and the drilling operation which exceeds contractual well depth in the drilling contract.

n pi: the basis for payment on drilling contracts when footage rates are suspended (as when the drilling rig is used in taking extra cores. logging. or other activities that delay actual drilling) or when the contract daywork rates. In effect, daywork rates pay the drilling contractor by the hour rather than by the foot.

n: See day rate charge.

n: The required time of daily operation in drilling contract.

dump bailer.
دکل شناور حفاری

abbr: I. direct current. 2. drill collar;used in drilling reports.

depth correction.



© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.