refinaryrig

دیکشنری تخصصی مهندسی نفت - نسخه آنلاین


بزرگترین دیکشنری مهندسی نفت با بیش از 20 هزار کلمه ، مصور و با قابلیت تلفظ



نمایش نتیجه 1 تا 10 از 18 نتیجه یافت شده برای cycling:
cycling coiled tubing from a yielded position, through a transition region, and back again. Running coiled tubing from the reel into a well and back to the reel involves six bends or three cycles.

n: that period following the completion of a cycling or pressure maintenance operation in a reservoir in which the remaining gas is produced from the reservoir without being replaced by injected gas.

n: See cycling time.
زمان گردش گل

n: the process by which effluent gas from a gas reservoir is passed through a gasprocessing plant or separation system and the remaining residue gas returned to the reservoir. The word recycling is sometimes used for this function, but it is not the

n: a plant that cycles residue gas back into the reservoir.

n: The time of circulating flushing of drilling fluid.

n: Unlike common three-cone bit,one of the three eyeholes of the blower fixed on the bit is enlarged and enforced. So the most affect is toward one orientation during cycling the drill fluid.




n: a drilling operation in which no fluid is circulated back up to the surface (often as a result of lost circulation). However, fluid is usually circulated into the well to cool the bit. See blind drilling.

n: drilling without drill fluid cycling out of the well
حفاری خشک

n: in order to differentiate from the common fluid ,some fluid is dyed as a result a seccion of chromatic fluid forms during cycling so as to calculate the pipe hole ,short-circuit location or the real retarded time by which the cuttings reverse out form t

n: the process of the mud cake being eroded because of the flushing affecion during the fluid cycling in the well


۱
۲

© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.