refinaryrig

دیکشنری تخصصی مهندسی نفت - نسخه آنلاین


بزرگترین دیکشنری مهندسی نفت با بیش از 20 هزار کلمه ، مصور و با قابلیت تلفظ



نمایش نتیجه 561 تا 570 از 581 نتیجه یافت شده برای lb:
n: The surface termination of a wellbore that incorporates facilities for installing casing hangers during the well construction phase. The wellhead also incorporates a means of hanging the production tubing and installing the Christmas tree and surface flow
مجموعه ی سر چاه

n: The surface termination of a wellbore that incorporates facilities for installing casing hangers during the well construction phase. The wellhead also incorporates a means of hanging the production tubing and installing the Christmas tree and surface flow

n: The surface termination of a wellbore that incorporates facilities for installing casing hangers during the well construction phase. The wellhead also incorporates a means of hanging the production tubing and installing the Christmas tree and surface flow

n: a borehole;the hole drilled by the bit. A wellbore may have casing in it or it may be open (uncased);or part of it may be cased, and part of it may be open. Also called a borehole or hole.

in drilling, the drilled hole.

a treatment designed to remove damage or debris from the wellbore and the perforations.

n: see wellbore soak.

the drawing of the well and its equipment showing depths, sizes, grades, and specific equipment.

n: The fluid of wellbore in the process of drilling and completion.

n: 1. bottomhole pressure. 2. casing pressure.

an early time frac failure when the frac width is too small and the fracture proppant bridges off on the fracture.



© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.