n: a cement wiper plug that precedes cement slurry down the casing. The plug wipes drilling mud off the walls of the casing and prevents it from contaminating the cement. See cementing, wiper plug. bottompull method n: an offshore pipeline construction technique in which the pipe string remains below the surface while it is towed to its final location.
n: See bottom wiper plug.
in cementing, the first plug pumped in cementing with the two plug system. It isolates the mud and cement slurry and allows passage of the cement slurry when the plug “bumps” or reaches the float shoe or float collar. It is hollow with a diaphragm that is
مجرابند ته چاه
n: pipeline construction in water depths of 100 feet (30.5 metres) or more.
n: an offshore pipeline construction technique in which the welded, coated. and tested pipe is coiled onto a reel and transferred to a reel barge. where it is paid out at a steady rate onto the ocean floor.
© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.