n: a technique in squeeze cementing in which (1) the zone below the producing interval is perforated and a high pressure squeeze carried out;(2) the zone the producing interval is perforated and squeezed off in a similar manner;(3) the hole is drilled out;and (4) the producing interval is perforated. The purpose of block squeezing is to isolate the producing interval and prevent communication with the sand immediately above and below the producing interval.

a cement squeeze into a area of perforations. Often done initially over the frac pressure.


n: a process used to repair a hole in the casing by pumping cement down tubing or drill pipe. First. the casinghead, or bradenhead, is closed to prevent fluid from moving up the casing. Then the rigs pumps are started. Pump pressure moves the cement out of the tubing or pipe and, since the top of the casing is closed, the cement goes into the hole in the casing. The tubing or pipe is pulled from the well and the cement allowed to harden. The hardened cement seals the hole in the casing. Although the term bradenhead squeezing" is still used, the term ,."bradenhead" is obsolete. See annular space. casinghead, squeeze.

n: 1. a failure of equipment.2. in a fracture treatment or a squeeze job, the failure of formation rock to withstand pressure, allowing it to rupture. adj: pertaining to the amount of pressure needed at the wellhead to rupture the formation in a fracture treatment or a squeeze job (as in formation breakdown pressure).

fracture.

n: a tool set temporarily in the casing or well to prevent the passage of cement, thereby forcing it to follow another designated path. It is used in squeeze cementing and other remedial cementing jobs.

n: A kind of tool for cement squeezing or remedying cementing job. Set into the casing or wellbore temporarily to stop cement slurry downflowing.

a temporary set plug to allow cement work above the tool. It is drilled out after the cement job.
توپک سیمان نگه دار

n: See cementing under pressure.

n: the application of a liquid slurry of cement and water to various points inside or outside the casing. See primary cementing, secondary cementing. squeeze cementing. cementing barge n: a barge containing the cementing pumps and other equipment needed for oilwell cementing in water operations.

v: To prepare and pump cement into place in a wellbore. Cementing operations may be undertaken to seal the annulus after a casing string has been run, to seal a lost circulation zone, to set a plug in an existing well from which to push off with directional
سیمانکاری

n: a retrievable cement squeeze tool that is used in remedial cementing. See remedial cementing;secondary cementing.

n: the procedure by which a quantity of resinous material is squeezed into a sandy formation to consolidate the sand and to prevent its flowing into the well. The resinous material hardens and creates a porous mass that permits oil to flow into the well but holds back the sand at the same time. See sand consolidation.
استحکام شیمیایی

n: a variation of squeeze cementing for wells with two producing zones in which (1) the upper fluid sand is perforated;(2) tubing is run with a packer, and the packer is set between the two perforated intervals;(3) water is circulated between the two zones to remove as much mud as possible from the channel;(4) cement is pumped through the channel and circulated;(5) the packer is released and picked up above the upper perforation, a low squeeze pressure is applied, and the excess cement is circulated out. The process is applicable where there is communication behind the pipe between the two producing zones because of channelling of the primary cement or where there is essentially no cement in the annulus.

a secondary or repair cement method using upper and lower perforations and a packer set between. Circulation is established with water and mud remover chemicals to clean the channel. Cement is circulated with a set volume pumped, then the packer is releas