refinaryrig

دیکشنری تخصصی مهندسی نفت - نسخه آنلاین


بزرگترین دیکشنری مهندسی نفت با بیش از 20 هزار کلمه ، مصور و با قابلیت تلفظ



نمایش نتیجه 1 تا 9 از 9 نتیجه یافت شده برای total depth:
n: The quotient of well total depth divides total time including productive time, nonproductive time, and rig releasing and installing time.

n: 1. the distance to which a well is drilled, stipulated in a drilling contract as contract depth. Total depth is the depth after drilling is finished. 2. on offshore drilling rigs, the distance from the baseline of a rig or a ship to the uppermost continuous deck. 3. the maximum pressure that a diver attains during a dive. expressed in feet (metres) of seawater.

n: The depth of drilling or The position of down hole equipment or operation in the wellbore.
عمق

high pressure, high temperature. HPHT is where the undisturbed bottom hole temp at prospective reservoir depth or total depth is greater than 300oF or 150oC, and either the maximum anticipated pore pressure of any porous formation to be drilled through ex

total depth or measured depth.

plug back total depth.

the total depth of penetration including the casing thickness, the cement and the formation.

abbr: total depth.

total depth measurement or pipe length to the depth. Used for displacement calculations.

n: (TD) the maximum depth reached in a well.

n: The planned end of a well, measured by the length of pipe required to reach the bottom.


the maximum depth of a well measured along the wellbore.

n: The ratio of the depth having been utility to the total depth.



© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.