refinaryrig

دیکشنری تخصصی مهندسی نفت - نسخه آنلاین


بزرگترین دیکشنری مهندسی نفت با بیش از 20 هزار کلمه ، مصور و با قابلیت تلفظ



نمایش نتیجه 1781 تا 1790 از 14709 نتیجه یافت شده برای P:
a completion technique where casing is cemented in the drilled hole and perforations are placed at the most promising flow points based on log interpretations.

n: a wellbore in which casing has been run.

n: The portion of the wellbore that has had metal casing placed and cemented to protect the openhole from fluids, pressures, wellbore stability problems, or a combination of these.
چاه جداره دار

تکمیل چاه جداره دار

n: Running DST in the formation packed by casing after perforation.

a sand control completion that uses a screen and a gravel pack to stop formation sand production.

any of several radioactive, chemical or physical properties logs that are run in a cased hole environment. May be conveyed by electric line, coiled tubing, slick line (memory logs) or drill pipe (LWD).

n: The well that the casing is tripped in the bottom of the reservoir when finishing drilling.

n: Logging in the cased hole, for example, cement bond log, casing caliper log, casing coupling log and other well loggings.

n: the procedure of recovering lost or stuck equipment in a well bore in which casing has been run.

n: the difference between inflow and outflow of funds over a period of time. Cash flow can be positive (profit) or negative (loss).



© ۱۳۹۲-۱۳۹۷ این اثر شامل قانون حمایت از مولفین بوده و هرگونه کپی برداری از آن ممنوع است.