نمایش نتیجه 331 تا 340 از 1065 نتیجه یافت شده برای over:
n: the rubber tools of hydraulically operated packoff colsed on the casing and connected in the place where the layer should be packed off
a rubber bladder over a section of casing that is inflated, usually with cement, to give an annular seal in open hole sections. Frequently used with liners and set at intervals along the open hole.
n: a fishing :tool containing metal-cutting knives that is lowered into the hole and over the outside of a length of pipe to cut it. The severed part of the pipe can then be brought to the surface. Also called an outside cutter. Compare internal cutter.
n: The cutter is composed by joint,shell,cutter and guide shoe
a mechanical, chemical or explosive device that is lowered over a pipe to cut from the outside.
a method of applying a very high pressure surge to the formation at the instant of perforating. Usually in excess of 1.4 psi/ft. Designed to overcome frac initiation pressure and break down each perf with a very short (<1 m) frac.
n: a portable electric heater that circulates air over an electric heating element into the space to be heated.
fF = (db/2V2) (P/L). Where = density (ppg),V = avg. fluid velocity (ft/sec),P is pressure loss over length L (ft).
n: an agreement whereby the owner of a lease who does not wish to drill at the time agrees to assign the leasehold interest, or some part of it, to a third party who does wish to drill, conditional on the third partys drilling a well within the expiration date of the primary term of the lease. The assignment may include the entire interest together with dry hole money, or partial interest or entire interest with or without an override. If an override is retained, the owner of the lease may retain an option to convert such overriding royalty retained to an agreed-upon working interest. A farmout is distinguished from a joint operating agreement by the fact that the partner farming out does not incur any of the drilling costs. The primary characteristic of a farmout is the obligation of the third party to drill one or more wells on the farmout acreage as a condition prerequisite to completion of the transfer of title to such third party.
n: that sheave on the crown block over which the fastline is reeved.
n: the idle wheel whose rotate speed is the fastest on the crown block,and the fast line has to pass this idle wheel to reach the barrel
چین وارونه ی گسلش یافته
n: (FERC) an independent agency (created in 1977) of the Department of Energy that has jurisdiction over oil pipelines engaged in interstate commerce. With respect to the natural gas industry, the general regulatory principles of the FERC are defined in the Natural Gas Act (NGA),and the Natural Gas Policy Act (NGPA). The FERC also has jurisdiction over wholesale interstate electric rates, hydroelectric licensing, and oil pipeline rates. Its predecessor was the Federal Power Commission (FPC). Address: 888 1st Street NE;Washington, DC 20426;(202) 208-0200.
n: an oil and gas lease on federal land issued under the Mineral Leasing Act. Federal leases usually provide step- scale or sliding-scale royalty;a flat discovery royalty of one-eighth may also be specified.